Product Description

Power: 4500W
Drying Tray Size:40*38CM Product Size:145D*61W*91H(CM)
Quantity of trays:48(Upper and Lower Rack Gap: 35mm)
Digital control Double layer outershell, Heat protection, Better drying performance Left&Middle&Right area with independent control. Top flat side can put around over 200KG things things, Save more space. Door handle can be both plastic and Aluminum
Material: 0.6-0.8mm thick SUS201 Stainless steel housing SUS304 Stainless steel trays, handle, locks etc.
Voltage: 220-240V/50hz
Time:0-24 housrs adjustable
Temperature setting range:35-90℃
Operating noise: 55-60decibels
Warranty:1 years (heating element for 3 years)

 1234567891011

Packaging & Shipping
Cartons (CM) L*W*H              N.W (KG) G.W (KG)
68*57*147 104 120
Our Services

Warranty:1 years (heating element for 3 years)

The major assistance Dalle will provide includes:

 

Helping customer to purchase complete equipment, including large injection moulding machine and punching machine.

  1. Providing customer with related mould, including plastic and hardware mould.
  2. Providing customer with related parts, gathering it and loading together.
  3. Dispatching engineers to Cusotmer’s factory and help them to plan production place, install the equipment and mould, training their worker and flow line production.
  4. Providing customer with improvement scheme of production, Solving all kind of urgent situation.
  5. Cooperating with customers and developing new rice cooker model together.

ODM project process

1.Communication Requirements:  Customer provide sample or design paper with details requirements.

2.factory quoting: quotation is passed by customer and factory provide die design.

3.making prototype: within 5-7days, provide the 1:1 mock-up 

4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment

5.Opening mould.   Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months

6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.

7.Trial production. Small mass production after passing the mould testing and do fully product test

8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.

9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.